Solar inspection

Electro Power inspects a solar system in Karachi or elsewhere in Pakistan before it is switched on, and again when output drops. The check covers panels, cables, and the inverter.

Before switch-on

Mounting, polarity, and the inverter reading are checked before the system is left running.

When output falls

A later visit looks for dust, a loose cable, or an inverter fault.

The install-day test is part of every home and business job.

Book an inspection if the reading is lower than usual.

The crew explains what was checked and what needs work.

Solar inverter and battery cabinet

Checks before and after the job

Inspection is a visit, not a new set of panels, unless the check shows that parts must be replaced. Call +92 300-1266095.